Installation
Instructions
- Adhesive:
- A. Use only Topstone 2 part adhesive to join pieces
for an invisible seam.
B. Select matching colors from the Topstone
Adhesive Color Chart.
C. Clean the adjoining areas carefully with a damp
cloth.
D. Cut the top of the hardener plastic tube and
the tip of the adhesive metal tube and insert the adhesive
into the hardener tube. Press out the air in the plastic
tube and attach the cap.
E. Manipulate the plastic tube for 3 or 4 minutes
in order to completely mix the 2 parts.
F. Cut off the nozzle on the plastic tube so as
to allow a 3 mm (1/8") bead of the mixture to be
applied to the middle of the width to be joined.
G. Position the 2 pieces and apply the adhesive
starting at the furthest point and working backwards.
H. Clamp together tightly so the adhesive overflows.
I. Allow 1 hour for the adhesive to dry at normal
room temperature. Remove the excess adhesive with a planer
and fine sand to a perfectly smooth finish.
Permanent Attachment
A. For application to cabinets, wipe the to edges
clean and place a bead of silicone adhesive on the edges.
Place the Topstone on the cabinet. Use shims as required
to achieve a level fit.
B. For horizontal applications to other base structures,
use a perimeter bead of silicone adhesive where the surface
comes in contact with the Topstone. Apply shims as required.
C. Use silicone adhesive for application to vertical
surface. Apply perimeter beads and vertical beads every
12". Use firring strips every 12" on center
for irregular walls and on sheet rock. Apply directly
to the wall only if the wall is smooth and of solid substances
such as wet plaster. Never apply directly to sheet rock.
Use support braces to keep the Topstone in place until
the adhesive dries, usually within 24 hours.
|